Assembly Release QA Steps: Difference between revisions

From Genecats
Jump to navigationJump to search
mNo edit summary
Line 19: Line 19:
</span>
</span>


When a developer is ready for a new assembly to be released, a member of the QA team will QA and release the assembly. <br>
When a developer is ready for a new assembly to be released, a member of the QA team will QA and release the assembly. This wiki section exists as a guide for the assembly QA and release process.  
This wiki section exists as a guide for the assembly QA and release process.  





Revision as of 02:05, 24 May 2017

Navigation Menu

Home Page
Assembly QA Part 1: DEV Steps
Assembly QA Part 2: Track Steps
Assembly QA Part 3: BETA Steps
Assembly QA Part 4: RR Steps


See also: Releasing an assembly (old steps)


Introduction

When a developer is ready for a new assembly to be released, a member of the QA team will QA and release the assembly. This wiki section exists as a guide for the assembly QA and release process.


The QA rock star can follow this guide in unison with a sync'd Google Spreadsheet checklist, where these wiki steps are automatically populated in the spreadsheet, and therefore will always be in sync with the wiki.


🔵 Ready to get started? Go to Assembly QA Part 1: DEV Steps